Crop portfolio

Primary crops managed through Qimo Farms

Oil palm, cocoa, coconut and mango are managed as distinct crop categories. A project-specific estate page is published only after management records the relevant farm project.

Young oil palm plantation with a grassed access path between rows

Oil palm

Elaeis guineensis

Oil palm is a primary commercial crop managed through structured field blocks, establishment maintenance and long-term plantation operations.

Illustrative view of a cocoa farm with cocoa trees and a soil path

Cocoa

Theobroma cacao

Cocoa is one of Qimo Farms’ four primary commercial crops, established through structured field layout, shade planning and early field management.

Coconut plantation with tall palms over natural ground cover

Coconut

Cocos nucifera

Coconut is a primary commercial crop developed with quality planting material, appropriate spacing, drainage and long-term field maintenance.

Young mango orchard with a grassed path between rows of fruiting trees

Mango

Mangifera indica

Mango is a primary orchard crop developed with grafted or improved planting material for fresh and processing-market opportunities.

Published farm projects

Young oil palm plantation with a grassed access path between rows

Qimo Palm Estate

Land preparation

Oil palm

Flagship oil palm division producing fresh fruit bunches, with potential future processing.

Current allocation
32 hectares
Coconut plantation with tall palms over natural ground cover

Qimo Coconut Estate

Land preparation

Coconut

Complementary coconut division diversifying produce and markets.

Current allocation
10 hectares
Young mango orchard with a grassed path between rows of fruiting trees

Qimo Mango Estate

Land preparation

Mango

Fruit division producing mango for fresh and processing markets.

Current allocation
6 hectares
Illustrative view of a cocoa farm with cocoa trees and a soil path

Qimo Cocoa Farm

Land preparation

Cocoa

Cocoa farm project currently in land preparation.

Current allocation
20 hectares
Land allocation

Confirmed current estate allocation

Soil testing is complete and all four crop projects are in land preparation. The confirmed 70-hectare estate contains 68 hectares of crop blocks: oil palm 32 hectares, cocoa 20 hectares, coconut 10 hectares and mango 6 hectares. Two hectares are reserved for roads, drainage, storage, water and shared infrastructure.

70 hectares total. 68 hectares are assigned to crops; 2 hectares are assigned to infrastructure and 0 hectares remain for future development.

Crop blocks · 68 hectares

Phase 1 allocation of the foundation estate
CropHectaresShare
Oil Palm3247%
Cocoa2029%
Coconut1015%
Mango69%
Crop allocation68100%

Infrastructure & operations

2 ha

Area assigned to roads, drainage, storage, water and shared estate infrastructure.

Status labels

Estate development stages

Each estate is shown at one of seven stages. A stage is only used when supported by actual records.

1.Planning

Estate design and planning are in progress. No land work has started.

2.Under verification

Land, survey, soil and topography checks are being carried out.

3.Land preparation

Clearing, access and layout works are under way.

4.Planting

Seedlings are being planted in the field.

5.Establishment

Young plants are being maintained through the establishment period.

6.Developing

Plants are maturing; early yields may be recorded.

7.Productive

The estate is in commercial production.

Chat on WhatsApp